Pick up the incorrect statement regarding a master trap from the following :
For 100 sq. m cement concrete (1 : 2 : 4) 4 cm thick floor, the quantity of cement required, is
All Chapters — Estimating And Costing Mcqs
Similar Questions
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
The quantity of coarse aggregate required for RCC (1:3:6) for 20 cubic metres of work is .................
The size of the faeces drop hole in the floor or slab should not be larger than
Which of the following requirement is given most importance in highway design?
The excavation exceeding 1.5 m in width and 10 sq. m in plan area with a depth not exceeding 30 cm, is termed as .......…
In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls …
Culverts cannot be constructed of a variety of materials including cast-in-place or precast concrete.
A ...................is developed using historical cost information that relates some software metric to the project cos…