MCQ
The detention period in a septic tank is assumed
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
The detention period in a septic tank is assumed
The brick work is measured in sq metre, in case of
While estimating a reinforced cement structure, the omitted cover of concrete is assumed
For 2nd class building superstructure shall be of 1st class brickwork in lime mortar.
The ICPB may be used in .....................
The maximum length of vehicle that can be used on Indian roads is .....................
...................................is required for preliminary studies of various aspects of a work or project.
Approx. cost of a bridge of 3 spans of 50 m each span @Rs.30000/- per running m of span comes to 3*50*30000 = Rs. 45 lak…