MCQ
The floor area includes the area of the balcony up to
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
The floor area includes the area of the balcony up to
The shape of the tank is circular.
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is
The expected out turn of 12 mm plastering with cement mortar is
The form used in public works for measurement book is ________.</p>
Pick up the correct statement from the following:
The damp proof course (D.P.C.) is measured in
The concrete work for the following part of the building of specified thickness is measured in square metres