MCQ
Pick up the correct statement from the following:
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
Pick up the correct statement from the following:
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as
Pick up the correct statement in case of water supply.
Berms are provided in canals if these are
For 100 sq. m cement concrete (1 : 2 : 4) 4 cm thick floor, the quantity of cement required, is
The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is
For 2nd class building rain water pipes shall be of .............................finished painted.
Pick up the excavation where measurements are made in square meters for payment.