You may be Loooking for
  • Notifications
    Mark All As Read
    Your Membership Plan has expired.Please Choose your desired plan from My plans
    January 01, 12:00 AM
    View All
  • image
    Guest
    Logged in
    Logout
IOE-BOOSTER
IOE
  • Questions
  • Todays Tutorials
  • Previous Tutorials
  • Asked Questions
  • Learning By playing
  • GAMES
  • Exams From
  • Todays Pick Studied question yet Model Exam Set (Premium Users)
  • Exam Results
  • Results
  • My Plans
  • My Plans

Ask Question
Ask Mcqs

image Guest

You need to login to ask any Questions from chapter Estimating-And-Costing-Mcqs of Estimating-And-Costing-Mcqs

Chapter:

Estimating-And-Costing-Mcqs

The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as


Surface excavation

Answer

Previous Question
Next Question

All Chapters

View all Chapter and number of question available From each chapter from Estimating-And-Costing-Mcqs

Estimating And Costing Mcqs

Estimating And Costing Mcqs

Estimating And Costing Loksewa Mcqs

Estimating And Costing Loksewa Mcqs

Similar Question

This Chapter Estimating-And-Costing-Mcqs consists of the following topics

The expected out turn of 12 mm plastering with cement mortar is

The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as

If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is

The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm

is termed as