You may be Loooking for
  • Notifications
    Mark All As Read
    Your Membership Plan has expired.Please Choose your desired plan from My plans
    January 01, 12:00 AM
    View All
  • image
    Guest
    Logged in
    Logout
IOE-BOOSTER
IOE
  • Questions
  • Todays Tutorials
  • Previous Tutorials
  • Asked Questions
  • Learning By playing
  • GAMES
  • Exams From
  • Todays Pick Studied question yet Model Exam Set (Premium Users)
  • Exam Results
  • Results
  • My Plans
  • My Plans

Ask Question
Ask Mcqs

image Guest

You need to login to ask any Questions from chapter Estimating-And-Costing-Mcqs of Estimating-And-Costing-Mcqs

Chapter:

Estimating-And-Costing-Mcqs

A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over sub-base of 10 cm thick gravel. The box cutting in road crust is


2000 m3

Answer

Previous Question
Next Question

All Chapters

View all Chapter and number of question available From each chapter from Estimating-And-Costing-Mcqs

Estimating And Costing Mcqs

Estimating And Costing Mcqs

Estimating And Costing Loksewa Mcqs

Estimating And Costing Loksewa Mcqs

Similar Question

This Chapter Estimating-And-Costing-Mcqs consists of the following topics

Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds

A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over sub-base of 10 cm thick gravel. The box cutting in road crust is

The concrete work for the following part of the building of specified thickness is measured in square meters

A cement concrete road is 1000 m long

8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is