MCQ
The cross-sections for a highway is taken at
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
The cross-sections for a highway is taken at
A large work or project may consists of several building or small works and each of these work is known as .............…
For 2nd class building superstructure shall be of 1st class brickwork in lime mortar.
For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is
The first chamber in a septic tank should be at least .............of the total length.
Pick up the incorrect statement regarding a master trap from the following:
A .........................is used to level the ground and spreads the loose material.
The height of the sink of wash basin above floor level is kept