For the construction of buildings, the subheads of the estimate are
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
For the construction of buildings, the subheads of the estimate are
The minimum width of a septic tank is taken
The measurement is made in square metre in case of
Pick up the correct statement from the following:
In the mid-section formula
A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It s…
As of 2013 pit latrines are used by an estimated .........................people.
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as