Check statements given below with respect to diagram below:

Height of wall = 3 m
All dimensions are mentioned in mm.
A: The centre line of wall is 27.50 m.
B: The short wall and long wall length is 8.5 m and 19 m respectively.
C. The total brickwork after deduction is 20.718 m3.
Check statements given below with respect to diagram below:

Height of wall = 3 m
All dimensions are mentioned in mm.
A: The centre line of wall is 27.50 m.
B: The short wall and long wall length is 8.5 m and 19 m respectively.
C. The total brickwork after deduction is 20.718 m3.
All Chapters
View all Chapter and number of question available From each chapter from Estimating-And-Costing-Mcqs
Similar Question
This Chapter Estimating-And-Costing-Mcqs consists of the following topics
</p><p style="text-align: justify;">A residential building fetches a monthly gross rent of Rs. 15,000. The annual outgoings in the form of taxes and other contingencies is Rs. 18,000. The cost of land comes to Rs. 8,00,000. Estimate the total value of property (in Rs.) on a yearly basis. Assume the rate of interest as 8% per annum.</p> <p></p>
Check statements given below with respect to diagram below:

Height of wall = 3 m
All dimensions are mentioned in mm.
A: The centre line of wall is 27.50 m.
B: The short wall and long wall length is 8.5 m and 19 m respectively.
C. The total brickwork after deduction is 20.718 m3.
Guest