Chapter:

Estimating-And-Costing-Mcqs

Check statements given below with respect to diagram below:

qImage65d32ffcb6ed3792ca4ee948

W=1000×1200

D=1200×2100

Height of wall = 3 m

All dimensions are mentioned in mm.

A: The centre line of wall is 27.50 m.

B: The short wall and long wall length is 8.5 m and 19 m respectively.

C. The total brickwork after deduction is 20.718 m3.


All Chapters

View all Chapter and number of question available From each chapter from Estimating-And-Costing-Mcqs

Similar Question

This Chapter Estimating-And-Costing-Mcqs consists of the following topics

</p><p style="text-align: justify;">A residential building fetches a monthly gross rent of Rs. 15,000. The annual outgoings in the form of taxes and other contingencies is Rs. 18,000. The cost of land comes to Rs. 8,00,000. Estimate the total value of property (in Rs.) on a yearly basis. Assume the rate of interest as 8% per annum.</p> <p></p>

Check statements given below with respect to diagram below:

qImage65d32ffcb6ed3792ca4ee948

W=1000×1200

D=1200×2100

Height of wall = 3 m

All dimensions are mentioned in mm.

A: The centre line of wall is 27.50 m.

B: The short wall and long wall length is 8.5 m and 19 m respectively.

C. The total brickwork after deduction is 20.718 m3.

</p><p>Justify the following statements and identify the correct combination of statements with respect to accounts in estimation and costing:</p> <p><o:p>P:</o:p>&nbsp;They are five classes of stores that can be defined in three categories.</p> <p>Q: All materials recieved are examined, counted, or weighed and entered in Measurement Book as well as in the Goods Recieved Sheet (Form 10-B).</p> <p>R: Issue of materials from stock should be made only on reciept of an Indent (Form-7).</p> <p></p>

</p><p>Check the statements given below with respect to the diagram below:</p> <p><img alt="qImage65d32ffcb6ed3792ca4ee948" src="./img-uploads/qImage65d32ffcb6ed3792ca4ee948.webp"></p> <p><span class="math-tex"><mjx-container class="MathJax CtxtMenu_Attached_0" jax="CHTML" tabindex="0" ctxtmenu_counter="0" style="font-size: 113.1%; position: relative;"><mjx-math class="MJX-TEX" aria-hidden="true"><mjx-mi class="mjx-i"><mjx-c class="mjx-c1D44A TEX-I"></mjx-c></mjx-mi><mjx-mo class="mjx-n" space="4"><mjx-c class="mjx-c3D"></mjx-c></mjx-mo><mjx-mn class="mjx-n" space="4"><mjx-c class="mjx-c31"></mjx-c><mjx-c class="mjx-c30"></mjx-c><mjx-c class="mjx-c30"></mjx-c><mjx-c class="mjx-c30"></mjx-c></mjx-mn><mjx-mo class="mjx-n" space="3"><mjx-c class="mjx-cD7"></mjx-c></mjx-mo><mjx-mn class="mjx-n" space="3"><mjx-c class="mjx-c31"></mjx-c><mjx-c class="mjx-c32"></mjx-c><mjx-c class="mjx-c30"></mjx-c><mjx-c class="mjx-c30"></mjx-c></mjx-mn></mjx-math><mjx-assistive-mml unselectable="on" display="inline"><math xmlns="http://www.w3.org/1998/Math/MathML"><mi>W</mi><mo>=</mo><mn>1000</mn><mo>×</mo><mn>1200</mn></math></mjx-assistive-mml></mjx-container></span></p> <p><span class="math-tex"><mjx-container class="MathJax CtxtMenu_Attached_0" jax="CHTML" tabindex="0" ctxtmenu_counter="1" style="font-size: 113.1%; position: relative;"><mjx-math class="MJX-TEX" aria-hidden="true"><mjx-mi class="mjx-i"><mjx-c class="mjx-c1D437 TEX-I"></mjx-c></mjx-mi><mjx-mo class="mjx-n" space="4"><mjx-c class="mjx-c3D"></mjx-c></mjx-mo><mjx-mn class="mjx-n" space="4"><mjx-c class="mjx-c31"></mjx-c><mjx-c class="mjx-c32"></mjx-c><mjx-c class="mjx-c30"></mjx-c><mjx-c class="mjx-c30"></mjx-c></mjx-mn><mjx-mo class="mjx-n" space="3"><mjx-c class="mjx-cD7"></mjx-c></mjx-mo><mjx-mn class="mjx-n" space="3"><mjx-c class="mjx-c32"></mjx-c><mjx-c class="mjx-c31"></mjx-c><mjx-c class="mjx-c30"></mjx-c><mjx-c class="mjx-c30"></mjx-c></mjx-mn></mjx-math><mjx-assistive-mml unselectable="on" display="inline"><math xmlns="http://www.w3.org/1998/Math/MathML"><mi>D</mi><mo>=</mo><mn>1200</mn><mo>×</mo><mn>2100</mn></math></mjx-assistive-mml></mjx-container></span></p> <p>Height of wall = 3 m</p> <p>All dimensions are mentioned in mm.</p> <p>A: The centre line of the wall is 27.50 m.</p> <p>B: The short wall and long wall length is&nbsp;8.5 m and 19 m respectively.</p> <p>C. The total brickwork after deduction is 20.718 m<sup>3</sup>.</p> <p></p>

Estimating And Costing Mcqs

Estimating-And-Costing-Mcqs