The expected out turn of the cement concrete 1 : 2 : 4 for per mason per day will be:</p>
The most reliable estimate is
All Chapters — Estimating And Costing Mcqs
Similar Questions
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
MCQ
MCQ
The position of the backfill lying above the horizontal plane at the top of wall is called
MCQ
.................................type of excavator carries the skimmer at its lower end.
MCQ
A person constructed a warehouse at a cost of Rs. 4,00,000, excluding the cost of land. The warehouse will become obsole…
MCQ
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as
MCQ
Pick up the correct statement from the following:
MCQ
In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls …
MCQ
According to SP: 27-1984, the thickness of slab or RC slab shall be measured to the nearest of:</p>