Septic tank is usually consists of brick wall in cement not less than ...............
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as
All Chapters — Estimating And Costing Mcqs
Similar Questions
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
MCQ
MCQ
The soil becomes weak in .....................
MCQ
The material retained or supported by the retaining structure is called .....................
MCQ
Per kilometre basis depending on the nature of road, for 10 km of a state highway approx. cost @ Rs. 50000/- per 1 km wo…
MCQ
While estimating the qualities for the construction of a building, the correct metric unit is
MCQ
The expected out turn of 2.5 cm cement concrete floor per mansion per day
MCQ
The first chamber in a septic tank should be at least .............of the total length.
MCQ
Calculate the number of bags of cement required for the 12 mm thick plastering of a wall of 5 m long, 3.5 m high and 300…