MCQ
A large work or project may consists of several building or small works and each of these work is known as .............…
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
A large work or project may consists of several building or small works and each of these work is known as .............…
The measurement is made in square metre in case of
For 100 sq. m cement concrete (1 : 2 : 4) 4 cm thick floor, the quantity of cement required, is
The material retained or supported by the retaining structure is called .....................
While preparing a detailed estimate
...................................is required for preliminary studies of various aspects of a work or project.
In the mid-section formula
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as