MCQ
For 2nd class building superstructure shall be of 1st class brickwork in lime mortar.
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
For 2nd class building superstructure shall be of 1st class brickwork in lime mortar.
Pick up the correct statement from the following:
The excavation exceeding 1.5 m in width and 10 sq. m in plan area with a depth not exceeding 30 cm, is termed as .......…
Pick up the incorrect statement from the following:
The floor area includes the area of the balcony up to
In the mid-section formula
The term “septic” refers to .........................
The order of booking dimensions is