MCQ
The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at z…
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at z…
Which of the following states that work expands to fill the time available.
Pick up the incorrect statement from the following:
The rate of payment is made for 100 cu m (per % cu m) in case of
It is often difficult to estimate size at an early stage in a project when only a specification is available
The ICPB may be used in .....................
The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is
Pick up the correct statement regarding the centre line method of estimating a building