MCQ
A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It s…
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It s…
For third class building flooring shall be of brick-on-edge floor over well rammed earth.
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as
In active stress, the major principal stress σ1 acting on the wall will be in ..................... plane.
The item of steel work which is measured in sq.m, is
Anti-siphonage pipe is connected to
The 'centre line method' is specially adopted for estimating
The slope of the outlet of 'P trap' below the horizontal is kept