The wedge-shaped portion of the backfill tending to move with the wall is called
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
The wedge-shaped portion of the backfill tending to move with the wall is called
The measurement is made for stone work in square metre in case of
For 2nd class building superstructure shall be of 1st class brickwork in lime mortar.
.................................type of excavator carries the skimmer at its lower end.
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as
The quantity of sand required for RCC (1:2:4) for 15 cubic metres of work is
The roofing cannot be made with slate.