The expected out turn for earth work in excavation in ordinary soil per workman per day is
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
The expected out turn for earth work in excavation in ordinary soil per workman per day is
If the span of crossing is greater than 12 feet (3.7 m), the structure is termed as bridge and otherwise is culvert.
The material retained or supported by the retaining structure is called .....................
The plinth area of a building not includes
The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended
The soil becomes weak in .....................
Pick up the incorrect statement regarding a master trap from the following:
.................................type of excavator carries Shovel at its lower end.