Which of the following materials is not used in the construction of a septic tank?
A residential building fetches a monthly gross rent of Rs. 15,000. The annual outgoings in the form of taxes and other contingencies is Rs. 18,000. The cost of land comes to Rs. 8,00,000. Estimate the total value of property (in Rs.) on a yearly basis. Assume the rate of interest as 8% per annum.
All Chapters — Estimating And Costing Mcqs
Similar Questions
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
The most reliable estiamte is
Pick up the item of work not included in the plinth area estimate
According to Indian Standards Institute, the actual size of modular bricks is
The plinth area of a building not includes
Which technique is applicable when other projects in the same analogy application domain have been completed?
It is often difficult to estimate size at an early stage in a project when only a specification is available
The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is