MCQ
The brick work is measured in sq metre, in case of
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
The brick work is measured in sq metre, in case of
Size, capacity and materials need be specified for
In case of laying gullies, siphons, intercepting traps, the cost includes
The soil becomes weak in .....................
Pick up the incorrect statement from the following:
The expected out turn of 2.5 cm cement concrete floor per manson per day
General specification gives the nature and the class of the work and the materials in general terms.
Which of the following states that work expands to fill the time available.