MCQ
The area is measured correct to the nearest
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
The area is measured correct to the nearest
It is often difficult to estimate size at an early stage in a project when only a specification is available
The quantity of coarse aggregate required for RCC (1:3:6) for 20 cubic metres of work is .................
As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken
While estimating a reinforced cement structure, the omitted cover of concrete is assumed
Approximate cost of sewerage project for a population of one Rs. 10/- head works out as Rs. 10 lakh.
During the disposal of the sludge, it must be .............
The height of the sink of wash basin above floor level is kept