MCQ
During the disposal of the sludge, it must be .............
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
During the disposal of the sludge, it must be .............
While estimating a reinforced cement structure, the omitted cover of concrete is assumed
Pick up the correct statement from the following:
The main factor to be considered while preparing a detailed estimate, is
The rate of payment is made for 100 cu m (per % cu m) in case of
In case of laying gullies, siphons, intercepting traps, the cost includes
Anti-siphonage pipe is connected to
A .........................is used to level the ground and spreads the loose material.