MCQ
Specification does not specify or describes the nature and the class off the work, materials to be used in the work, wor…
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
Specification does not specify or describes the nature and the class off the work, materials to be used in the work, wor…
Which item is considered as one item during estimating of work?</p>
For 100 sq. m cement concrete (1 : 2 : 4) 4 cm thick floor, the quantity of cement required, is
Approximate cost of sewerage project for a population of one Rs. 10/- head works out as Rs. 10 lakh.
The expected out turn of 12 mm plastering with cement mortar is
3 SEPTIC TANK
What is related to the overall functionality of the delivered software?
If tensile stress of a steel rod of diameter D is 1400 kg/cm2 and bond stress is 6 kg/cm2, the required bond length of t…