MCQ
As of 2013 pit latrines are used by an estimated .........................people.
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
As of 2013 pit latrines are used by an estimated .........................people.
The plastic state of stress was proposed by
Pick up the item of work not included in the plinth area estimate
The expected out turn for earth work in excavation in ordinary soil per workman per day is
As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken
Which of the following are parameters involved in computing the total cost of a software development project?
The measurement is made in square metre in case of
The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at z…