The working from whole to the part is done in surveying in order to ensure that ............
Overturning of vehicles on a curve can be avoided by using ............
All Chapters — Engineering Surveying Mcqs
Similar Questions
From Engineering Surveying Mcqs 1 · Engineering Surveying Mcqs
MCQ
MCQ
The limiting length of the offset is ............ when its perpendicular direction is set out by an eye.
MCQ
The lines passing through points at which the magnetic declination is equal at a given time are called ............
MCQ
If a tacheometer is fitted with an anallatic lens ............
MCQ
The trapezoidal rule of volumes V of an embankment divided into a number of sections equidistant D, is given by ........…
MCQ
The principle of working from whole to part is used in surveying because ............
MCQ
Number of subdivisions per metre length of a leveling staff is ............
MCQ
Correct length of a 50 m tape, weighing 1.2 kg when a pull of 12 kg is applied at the ends and is freely suspended is ..…