MCQ
Under normal conditions using an ordinary cement, the period of removal of the form work, is:
This content is available for premium members only. Please select a plan.
Login / Get AccessFrom Concrete Technology Mcqs 2 · Concrete Technology Mcqs
Under normal conditions using an ordinary cement, the period of removal of the form work, is:
For finding compressive strength of concrete, the minimum number of cubes required is
The phenomenon by virtue of which the cement does not undergo large change in volume when treated with water, is known a…
The bulking of aggregate is due to
The cement becomes useless if it absorbed moisture more than
Higher workability of concrete is required if the structure is
Volume of coarse aggregate required to make 100m³ of 1:2:4 concrete is
For continuous transportation of concrete, the method used is