Allowable shear strength of concrete, depends upon
Premium Content
This content is available for premium members only. Please select a plan.
Login / Get AccessSimilar Questions
From Concrete Technology Mcqs 2 · Concrete Technology Mcqs
MCQ
MCQ
The process of keeping concrete moist for a certain period after its finishing, is known as
MCQ
The shuttering of a hall measuring 4m × 5m, can be removed after
MCQ
Higher workability of concrete is required if the structure is
MCQ
An aggregate having all the pores filled with water but having dry surface is called
MCQ
Under normal conditions using an ordinary cement, the period of removal of the form work, is:
MCQ
The concrete in which no preliminary tests are performed for designing the mix is called
MCQ
In a cement store, the size of cement pile is 4 m x 3 m and its height is 1.8 m. The number of cement bags in the pile c…