1. _____ culverts have a concrete (sometimes or materials can be used too) floor allowing water to flow smoothly through it.


2. Sealing well protects well’s producing zone from contamination.


3. Subsurface Textile Irrigation (SSTI) is a technology designed specifically for subirrigation in only desert sands and heavy clays.


4. ______ is prepared on basis of plinth area of building, rate being deducted from cost of similar building having similar specification, heights and construction, in locality.


5. Drilled wells are smaller in diameter, usually ranging from 10-20 cm (4-8 in.).


6. Production or pumping wells, are often smaller diameter wells used to monitor hydraulic head or sample groundwater for chemical constituents.


7. Culverts cannot be constructed of a variety of materials including cast-in-place or precast concrete.


8. Name type of irrigation, which is oldest form of irrigation and has been in use for thousands of years.


9. Around 30% of wastewater produced globally remains untreated, causing widespread water pollution.


10. Approximate cost of a hostel building for 100 students @Rs.10000/- per student works out as Rs. 10 lakhs.


All Chapters

View all Chapter and number of question available From each chapter from Civil-Engineering-Drawing-

Lettering Practice, Scales & Curves

Lettering Practice, Scales & Curves

Orthographic Projection, Projections of Lines, Planes and Solids

Orthographic Projection, Projections of Lines, Planes and Solids

Development of Surfaces, Isometric Projections, Perspective Projections & Transformation of Projections

Development of Surfaces, Isometric Projections, Perspective Projections & Transformation of Projections

Nomography, Computer Aided Drafting & Procedure of Estimating

Nomography, Computer Aided Drafting & Procedure of Estimating

Methods of Building Estimate & Estimate of Building

Methods of Building Estimate & Estimate of Building

Different Type Roofs, R.C.C. Work and Structure

Different Type Roofs, R.C.C. Work and Structure

Road Estimating, Sanitary and Water Supply Work

Road Estimating, Sanitary and Water Supply Work

Irrigation Works, Culverts, Bridges and Wells

Irrigation Works, Culverts, Bridges and Wells

Analysis of Rates

Analysis of Rates

Specifications, Estimation of Quantities of Materials and Transport

Specifications, Estimation of Quantities of Materials and Transport

Rules and Methods of Measurement

Rules and Methods of Measurement

Valuation, Reports Technical and Design Data

Valuation, Reports Technical and Design Data

P.W.D. Accounts and Procedure for Works

P.W.D. Accounts and Procedure for Works

Planning of Building and Colony

Planning of Building and Colony

Village Housing

Village Housing

Schedule of Rates Metric and F.B. System

Schedule of Rates Metric and F.B. System