1. Which of following CD works carry drainage over canal?
2. The canal water flows freely under gravity in which of following CD works?
3. A Super passage is reverse of __________
4. Which of following statement is not correct about canal syphon?
5. Which CD work is generally adopted when drainage discharge is small and drain crosses canal with its bed level equal to or slightly higher than canal FSL?
6. The drainage water is sometimes allowed to join canal water to augment canal supplies through a hydraulic structure is called as ____________
7. The crossing arrangement preferably made at junction of a huge canal and a river stream carrying a short-lived high flood discharge at almost equal bed levels is a ______
8. In a syphon aqueduct provided with a pucca bottom floor, uplift will occur on ______
9. Which of following is a disadvantage of CD works carrying canal over discharge?
10. In which of following arrangement, perennial drainage discharge is advantageously used?
All Chapters
View all Chapter and number of question available From each chapter from Irrigation-engineering-Mcqs
Techniques & Quality
Techniques & Quality
Water Requirements of Crops
Water Requirements of Crops
Canal Irrigation System
Canal Irrigation System
Sediment Transport and Irrigation Channels Design
Sediment Transport and Irrigation Channels Design
Lining of Irrigation Canals and its Economics
Lining of Irrigation Canals and its Economics
Water Logged Reclamation and Saline Soils for Agricultural Purposes
Water Logged Reclamation and Saline Soils for Agricultural Purposes
Irrigation Revenue Rates
Irrigation Revenue Rates
Rivers Behaviour, Control and Training
Rivers Behaviour, Control and Training
Diversion Head Works, Hydraulic Jump Usefulness in Irrigation Structure
Diversion Head Works, Hydraulic Jump Usefulness in Irrigation Structure
Seepage Theories and Weirs and Barrages Design
Seepage Theories and Weirs and Barrages Design
Canal Falls
Canal Falls
Regulation Modules and Canal Structure
Regulation Modules and Canal Structure
Cross Drainage Work
Cross Drainage Work
Culverts Small Road Bridges Construction
Culverts Small Road Bridges Construction
Ground Water for Irrigation through Wells and Tubewells
Ground Water for Irrigation through Wells and Tubewells
General and Particular Dams
General and Particular Dams
Reservoirs and Dam Reservoirs Planning
Reservoirs and Dam Reservoirs Planning
Gravity and Dam Design Construction
Gravity and Dam Design Construction
Earthen and Rock Fill Dams
Earthen and Rock Fill Dams
Spillways, Energy Dissipators and Spillway Gates
Spillways, Energy Dissipators and Spillway Gates
Pressure Conduits, Outlet Works through Dams and Rivers
Pressure Conduits, Outlet Works through Dams and Rivers
Hydro Electric Power
Hydro Electric Power
River Navigation and Tank Irrigation
River Navigation and Tank Irrigation
Arch and Buttress Dams
Arch and Buttress Dams
Exam oriented Questions
Exam oriented Questions from irrigation engineering
Topics
This Chapter cross-drainage-work consists of the following topics