Chapter:

sediment-transport-and-irrigation-channels-design

1. Kor demand of crop should be taken into account while fixing capacity of a canal.


2. What is most important point to be considered while fixing canal capacity?


3. Let us consider in a given area plantation of a certain crop takes 20 days, and total water depth required by this crop is 80 cm on field. Find duty of irrigation water required for crop during this period. (


4. A pump was installed in a field to supply water to crops. The duty for this crop is 432 hectares/cumec on field and efficiency of pump is 50%. The sown area of field is 5 hectares. Determine maximum output required (H.P) of pump, if highest water level is 4 meters below highest portion of field. Assume negligible field channel losses.


5. At a certain place, transplantation of a crop takes 15 days, and total depth of water required by crop is 90 cm on field. During plantation rain falls and about 20 cm is utilised to fulfil demand. Now determine duty of irrigation water required during plantation.


6. Let us take gross commanded area of a watercourse is 2000 hectares, 80% of which is culturable irrigable. Intensities of sugarcane and paddy are 30% and 50%. The duties of crops at head of watercourse are 850 hectares/cumec and 1900 hectares/cumec. Find discharge required at head of watercourse?


7. We can find out monthly or fortnightly water requirements of various crops using intervals.


8. By how much percentage canal capacity is increased to meet peak demands?


9. Suppose culturable commanded for a distributary is 8000 hectares, and intensity of irrigation for Kharif season is 60% and that of rabi season is 30%. The average duty at head of a distributary is 4000 hectares/cumec for Kharif season and for Rabi season it is 1800 hectares/cumec, find out discharge required at head of distributary?


10. Determine discharge required at head of distributary in a canal where Kharif area to be irrigated is 2400 hectares and Rabi area to be irrigated is 1800 hectares, for fulfilling maximum crop requirement. Assume suitable values for kor depth and kor period.


All Chapters

View all Chapter and number of question available From each chapter from Irrigation-engineering-Mcqs

Techniques & Quality

Techniques & Quality

Water Requirements of Crops

Water Requirements of Crops

Canal Irrigation System

Canal Irrigation System

Sediment Transport and Irrigation Channels Design

Sediment Transport and Irrigation Channels Design

Lining of Irrigation Canals and its Economics

Lining of Irrigation Canals and its Economics

Water Logged Reclamation and Saline Soils for Agricultural Purposes

Water Logged Reclamation and Saline Soils for Agricultural Purposes

Irrigation Revenue Rates

Irrigation Revenue Rates

Rivers Behaviour, Control and Training

Rivers Behaviour, Control and Training

Diversion Head Works, Hydraulic Jump Usefulness in Irrigation Structure

Diversion Head Works, Hydraulic Jump Usefulness in Irrigation Structure

Seepage Theories and Weirs and Barrages Design

Seepage Theories and Weirs and Barrages Design

Canal Falls

Canal Falls

Regulation Modules and Canal Structure

Regulation Modules and Canal Structure

Cross Drainage Work

Cross Drainage Work

Culverts Small Road Bridges Construction

Culverts Small Road Bridges Construction

Ground Water for Irrigation through Wells and Tubewells

Ground Water for Irrigation through Wells and Tubewells

General and Particular Dams

General and Particular Dams

Reservoirs and Dam Reservoirs Planning

Reservoirs and Dam Reservoirs Planning

Gravity and Dam Design Construction

Gravity and Dam Design Construction

Earthen and Rock Fill Dams

Earthen and Rock Fill Dams

Spillways, Energy Dissipators and Spillway Gates

Spillways, Energy Dissipators and Spillway Gates

Pressure Conduits, Outlet Works through Dams and Rivers

Pressure Conduits, Outlet Works through Dams and Rivers

Hydro Electric Power

Hydro Electric Power

River Navigation and Tank Irrigation

River Navigation and Tank Irrigation

Arch and Buttress Dams

Arch and Buttress Dams

Exam oriented Questions

Exam oriented Questions from irrigation engineering

Topics

This Chapter sediment-transport-and-irrigation-channels-design consists of the following topics

Sediment Transport and Irrigation Channels Design

Kor demand of crop should be taken into account while fixing capacity of a canal.

;

What is most important point to be considered while fixing canal capacity?

;

Let us consider in a given area plantation of a certain crop takes 20 days, and total water depth required by this crop is 80 cm on field. Find duty of irrigation water required for crop during this period. (

;

A pump was installed in a field to supply water to crops. The duty for this crop is 432 hectares/cumec on field and efficiency of pump is 50%. The sown area of field is 5 hectares. Determine maximum output required (H.P) of pump, if highest water level is 4 meters below highest portion of field. Assume negligible field channel losses.

;

At a certain place, transplantation of a crop takes 15 days, and total depth of water required by crop is 90 cm on field. During plantation rain falls and about 20 cm is utilised to fulfil demand. Now determine duty of irrigation water required during plantation.

;

Let us take gross commanded area of a watercourse is 2000 hectares, 80% of which is culturable irrigable. Intensities of sugarcane and paddy are 30% and 50%. The duties of crops at head of watercourse are 850 hectares/cumec and 1900 hectares/cumec. Find discharge required at head of watercourse?

;

We can find out monthly or fortnightly water requirements of various crops using intervals.

;

By how much percentage canal capacity is increased to meet peak demands?

;

Suppose culturable commanded for a distributary is 8000 hectares, and intensity of irrigation for Kharif season is 60% and that of rabi season is 30%. The average duty at head of a distributary is 4000 hectares/cumec for Kharif season and for Rabi season it is 1800 hectares/cumec, find out discharge required at head of distributary?

;

Determine discharge required at head of distributary in a canal where Kharif area to be irrigated is 2400 hectares and Rabi area to be irrigated is 1800 hectares, for fulfilling maximum crop requirement. Assume suitable values for kor depth and kor period.

;