Chapter:

Canal-Falls

1. The canal alignment is finalized only after finalizing CD works.


2. What is maximum expansion or contraction allowed for joint filler material with an initial gap of about 30 mm?


3. Which of following wings protect earn slopes of canal and also guide drainage water?


4. A partial contraction joint is one in which?


5. The expansion joints in floors and walls should normally be provided at a spacing of not more than _______


6. The type of canal alignment which involves maximum CD works is a __________


7. The crossing arrangement preferably made at junction of a huge canal and a river stream carrying a short-lived high flood discharge at almost equal bed levels is a ______


8. The relative bed levels of canal and drainage may be changed and manipulated by _____________


9. The permissible velocity through barrels is generally limited to _________


10. The use of sealing compounds for vertical joints is very successful.


All Chapters

View all Chapter and number of question available From each chapter from Irrigation-engineering-Mcqs

Techniques & Quality

Techniques & Quality

Water Requirements of Crops

Water Requirements of Crops

Canal Irrigation System

Canal Irrigation System

Sediment Transport and Irrigation Channels Design

Sediment Transport and Irrigation Channels Design

Lining of Irrigation Canals and its Economics

Lining of Irrigation Canals and its Economics

Water Logged Reclamation and Saline Soils for Agricultural Purposes

Water Logged Reclamation and Saline Soils for Agricultural Purposes

Irrigation Revenue Rates

Irrigation Revenue Rates

Rivers Behaviour, Control and Training

Rivers Behaviour, Control and Training

Diversion Head Works, Hydraulic Jump Usefulness in Irrigation Structure

Diversion Head Works, Hydraulic Jump Usefulness in Irrigation Structure

Seepage Theories and Weirs and Barrages Design

Seepage Theories and Weirs and Barrages Design

Canal Falls

Canal Falls

Regulation Modules and Canal Structure

Regulation Modules and Canal Structure

Cross Drainage Work

Cross Drainage Work

Culverts Small Road Bridges Construction

Culverts Small Road Bridges Construction

Ground Water for Irrigation through Wells and Tubewells

Ground Water for Irrigation through Wells and Tubewells

General and Particular Dams

General and Particular Dams

Reservoirs and Dam Reservoirs Planning

Reservoirs and Dam Reservoirs Planning

Gravity and Dam Design Construction

Gravity and Dam Design Construction

Earthen and Rock Fill Dams

Earthen and Rock Fill Dams

Spillways, Energy Dissipators and Spillway Gates

Spillways, Energy Dissipators and Spillway Gates

Pressure Conduits, Outlet Works through Dams and Rivers

Pressure Conduits, Outlet Works through Dams and Rivers

Hydro Electric Power

Hydro Electric Power

River Navigation and Tank Irrigation

River Navigation and Tank Irrigation

Arch and Buttress Dams

Arch and Buttress Dams

Exam oriented Questions

Exam oriented Questions from irrigation engineering