Chapter:
Exam-oriented-Questions
1. Bar screens used to cover dam outlets to prevent entry of debris or ice into sluiceway conduits are called __________
2. A 4 m diameter tunnel has been constructed through an earn dam with a bell mouth entry. The water levels on U/s and D/s sides of dam are at RL 226 m and 210 m respectively. What will be discharge through this outlet?
3. Which of following statement is incorrect?
4. River intakes is usually situated on ________________
5. The more rapid closure of valve, greater is water hammer pressure developed.
6. A 2 m diameter sluiceway at RL 300 m is provided through a concrete overflow dam section to release water to downstream where tail water level is not more than 275 m. The discharge through this outlet when water level in reservoir is at FRL of 330 m is of order of_________________
7. The flow through penstocks and pressure conduits is generally ________________
8. What is correct Douma’s equation for rectangular tunnels or conduits?
9. Which of following conduits is used when large diameter pipes of smaller wall thickness are required?
10. The head loss in flow of water through a penstock pipe of given length ________
All Chapters
View all Chapter and number of question available From each chapter from Irrigation-engineering-Mcqs
Techniques & Quality
Techniques & Quality
Water Requirements of Crops
Water Requirements of Crops
Canal Irrigation System
Canal Irrigation System
Sediment Transport and Irrigation Channels Design
Sediment Transport and Irrigation Channels Design
Lining of Irrigation Canals and its Economics
Lining of Irrigation Canals and its Economics
Water Logged Reclamation and Saline Soils for Agricultural Purposes
Water Logged Reclamation and Saline Soils for Agricultural Purposes
Irrigation Revenue Rates
Irrigation Revenue Rates
Rivers Behaviour, Control and Training
Rivers Behaviour, Control and Training
Diversion Head Works, Hydraulic Jump Usefulness in Irrigation Structure
Diversion Head Works, Hydraulic Jump Usefulness in Irrigation Structure
Seepage Theories and Weirs and Barrages Design
Seepage Theories and Weirs and Barrages Design
Canal Falls
Canal Falls
Regulation Modules and Canal Structure
Regulation Modules and Canal Structure
Cross Drainage Work
Cross Drainage Work
Culverts Small Road Bridges Construction
Culverts Small Road Bridges Construction
Ground Water for Irrigation through Wells and Tubewells
Ground Water for Irrigation through Wells and Tubewells
General and Particular Dams
General and Particular Dams
Reservoirs and Dam Reservoirs Planning
Reservoirs and Dam Reservoirs Planning
Gravity and Dam Design Construction
Gravity and Dam Design Construction
Earthen and Rock Fill Dams
Earthen and Rock Fill Dams
Spillways, Energy Dissipators and Spillway Gates
Spillways, Energy Dissipators and Spillway Gates
Pressure Conduits, Outlet Works through Dams and Rivers
Pressure Conduits, Outlet Works through Dams and Rivers
Hydro Electric Power
Hydro Electric Power
River Navigation and Tank Irrigation
River Navigation and Tank Irrigation
Arch and Buttress Dams
Arch and Buttress Dams
Exam oriented Questions
Exam oriented Questions from irrigation engineering
Topics
This Chapter Exam-oriented-Questions consists of the following topics
Guest