Chapter:
Lettering-Practice,-Scales-
1. Estimate quantities of brickwork and plastering required in a wall 4m long, 3m high and 30 cm thick. Calculate also cost if rate of brickwork is Rs.32.00 per cu.m and of plastering is Rs. 8.50 per sq.m.
2. For construction of buildings, subheads of estimate are ____
3. The height of sink of wash basin above floor level is kept at _____
4. The figure below represents octagonal structure.
5. Unit of payment in MKS of RCC bars is _________
6. Which type of estimate is prepared by calculating building area and n multiplying area by predefined unit cost?
7. Which option is not considered as duty of quantity surveyor?
8. Cost of fittings and ir fixing is specified for following sanitary fittings ____
9. The measurement is made for stone work in square metre in case of ____
10. Unit of measurement in MKS of DPC is ________
All Chapters
View all Chapter and number of question available From each chapter from Civil-Engineering-Drawing-
Lettering Practice, Scales & Curves
Lettering Practice, Scales & Curves
Orthographic Projection, Projections of Lines, Planes and Solids
Orthographic Projection, Projections of Lines, Planes and Solids
Development of Surfaces, Isometric Projections, Perspective Projections & Transformation of Projections
Development of Surfaces, Isometric Projections, Perspective Projections & Transformation of Projections
Nomography, Computer Aided Drafting & Procedure of Estimating
Nomography, Computer Aided Drafting & Procedure of Estimating
Methods of Building Estimate & Estimate of Building
Methods of Building Estimate & Estimate of Building
Different Type Roofs, R.C.C. Work and Structure
Different Type Roofs, R.C.C. Work and Structure
Road Estimating, Sanitary and Water Supply Work
Road Estimating, Sanitary and Water Supply Work
Irrigation Works, Culverts, Bridges and Wells
Irrigation Works, Culverts, Bridges and Wells
Analysis of Rates
Analysis of Rates
Specifications, Estimation of Quantities of Materials and Transport
Specifications, Estimation of Quantities of Materials and Transport
Rules and Methods of Measurement
Rules and Methods of Measurement
Valuation, Reports Technical and Design Data
Valuation, Reports Technical and Design Data
P.W.D. Accounts and Procedure for Works
P.W.D. Accounts and Procedure for Works
Planning of Building and Colony
Planning of Building and Colony
Village Housing
Village Housing
Schedule of Rates Metric and F.B. System
Schedule of Rates Metric and F.B. System
Topics
This Chapter Lettering-Practice,-Scales- consists of the following topics