Septic Tanks, Oil and Grease Removal

Course: Waste Water Engineering — Practice MCQs, solutions, formulas & past entrance questions.

Chapter:

septic-tanks-oil-and-grease-removal (Click to view content)

1. How much spacing should be provided in between tubes?


2. What is detention time considered for contact zone while designing conventional dissolved air floatation process?


3. Organo clays are manufactured by modifying _____with quaternary amines.


4. What is contact zone loading rate for a conventional dissolved air floatation process considered?


5. DAF separates ___ in water.


6. __________ maintain required water quality to membrane without use of chemicals.


7. What is tank water depth?


8. The shape of tank is circular.


9. The smallest particle size requiring removal from fluid stream is called __


10. Large amount of wastewater constantly produced _____ treatment time of wastewater in a septic tank.