Chapter:

highway-alignment-and-project-preparation

1. For small projects which type of method is used for calculation of project time?


2. A part of land that is acquired during initial stages of construction for future expansion is called ________


3. The basic requirement of alignment should be ______


4. The report that includes all works including soil, bridges, topography, material studies and drainage studies is called as ______


5. The resisting length should be kept ______


6. The drawing for re alignment shows existing road, proposed re alignment, contours and all or features it is called as _______


7. The strength of materials can be checked by _______


8. Detailed size drawings are prepared in which sheet?


9. The economical option during construction of a road around a hill is ______


10. Inspection of site is done in which survey?