1. Which of following is prepared first during estimate?


2. The New highway project is divided into how many stages?


3. The surveys of highway alignment are completed in how many stages?


4. The DPR consists of how many components?


5. The improper alignment of road will not result in ______


6. The approximate cost of construction evaluated for project is called ______


7. Which of following is not a structure constructed for drainage purposes?


8. Which method is recommended by IRC for flexible pavements?


9. Expand GPS?


10. The cross sections should be drawn for every ______