Highway Alignment and Project Preparation

Course: Highway Engineering — Practice MCQs, solutions, formulas & past entrance questions.

Chapter:

highway-alignment-and-project-preparation (Click to view content)

1. The stability of slopes is considered while designing?


2. The economical option during construction of a road around a hill is ______


3. Detailed size drawings are prepared in which sheet?


4. The intervals for levelling work in rolling terrain are taken as ______


5. Inspection of site is done in which survey?


6. The strength of materials can be checked by _______


7. The report that includes all works including soil, bridges, topography, material studies and drainage studies is called as ______


8. The basic requirement of alignment should be ______


9. The drawing for re alignment shows existing road, proposed re alignment, contours and all or features it is called as _______


10. The resisting length should be kept ______


WhatsApp