1. The sustained contact with water cause failure due to ______


2. The clay seal may be provided if seepage zone is at a depth of less than ______


3. The relationship between specific yield specific retention and porosity is ______


4. The swelling and shrinkage is mostly seen in ______


5. The removal and diversion of surface water from roadway is called _______


6. The span of RCC slab is limited to ______


7. The preferable height of water table should be ______


8. The D85 point size is given by ______


9. The roughness coefficient is assumed in ______


10. The portion of water which flows on surface is called ______