You may be Loooking for
  • Notifications
    Mark All As Read
    Your Membership Plan has expired.Please Choose your desired plan from My plans
    January 01, 12:00 AM
    View All
  • image
    Guest
    Logged in
    Logout
IOE-BOOSTER
IOE
  • Questions
  • Todays Tutorials
  • Previous Tutorials
  • Asked Questions
  • Learning By playing
  • GAMES
  • Exams From
  • Todays Pick Studied question yet Model Exam Set (Premium Users)
  • Exam Results
  • Results
  • My Plans
  • My Plans

Ask Question
Ask Mcqs

image Guest

You need to login to ask any Questions from chapter Estimating-And-Costing-Mcqs of Estimating-And-Costing-Mcqs

Chapter:

Estimating-And-Costing-Mcqs

Pick up item of work not included in plinth area estimate


Courtyard area

Answer

Previous Question
Next Question

All Chapters

View all Chapter and number of question available From each chapter from Estimating-And-Costing-Mcqs

Estimating And Costing Mcqs

Estimating And Costing Mcqs

Estimating And Costing Loksewa Mcqs

Estimating And Costing Loksewa Mcqs

Similar Question

This Chapter Estimating-And-Costing-Mcqs consists of the following topics

While estimating a reinforced cement structure, the omitted cover of concrete is assumed

Pick up item of work not included in plinth area estimate

The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2 : 1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is

Pick up the item of work not included in the plinth area estimate

Estimating And Costing Mcqs

Estimating-And-Costing-Mcqs

Info Message
Chat on WhatsApp