MCQ
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as
The cross-sections for a highway is taken at
In which type of estimate is 'Court yard' NOT considered?</p>
The expected out turn of 12 mm plastering with cement mortar is:</p>
The detention period in a septic tank is assumed
The ICPB may be used in .....................
If the span of crossing is greater than 12 feet (3.7 m), the structure is termed as bridge and otherwise is culvert.
The minimum width of a septic tank is taken