In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls …
Identify the incorrect form of cash with respect to the modes of cash accepted in the Public Works Department from the options given below.
All Chapters — Estimating And Costing Mcqs
Similar Questions
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
MCQ
MCQ
Pick up the item whose weight is added to the weight of respective item, is
MCQ
For 2nd class building superstructure shall be of 1st class brickwork in lime mortar.
MCQ
The detention period in a septic tank is assumed
MCQ
The assumption on which the trapezoidal formula for volumes is based, is
MCQ
According to SP: 27-1984, the thickness of slab or RC slab shall be measured to the nearest of:</p>
MCQ
Approx. cost of a bridge of 3 spans of 50 m each span @Rs.30000/- per running m of span comes to 3*50*30000 = Rs. 45 lak…
MCQ
The roofing cannot be made with slate.