Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds
A .................................can be used on wet ground and in all conditions of weather.
All Chapters — Estimating And Costing Mcqs
Similar Questions
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
MCQ
MCQ
Brick walls are measured in sq. m if the thickness of the wall is
MCQ
A room is 4 m × 3 m with 20 cm walls all around. The estimate of walls by central line method will be&…
MCQ
Specification does not specify or describes the nature and the class off the work, materials to be used in the work, wor…
MCQ
.....................is prepared on the basis of plinth area of building, the rate being deducted from the cost of simil…
MCQ
Pick up the correct statement from the following:
MCQ
The expected out-turn of a stone cutter for an item of work “Ashlar stone dressing” is:</p>
MCQ
For third class building flooring shall be of brick-on-edge floor over well rammed earth.