While estimating the qualities for the construction of a building, the correct metric unit is
Pick up the correct statement from the following:
All Chapters — Estimating And Costing Mcqs
Similar Questions
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
MCQ
MCQ
For the construction of buildings, the subheads of the estimate are
MCQ
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as
MCQ
.................................type of excavator carries Shovel at its lower end.
MCQ
For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is
MCQ
The concrete work for the following part of the building of specified thickness is measured in square meters
MCQ
The maximum stress sustained by concrete pavements in kg/cm2 is .....................
MCQ
Pick up the correct statement from the following: