1. The shortest possible time in which an activity can be achieved under ideal circumstances is known as ____


2. The full form of BIS is _____


3. The symbols A and B represent ___ and ___ respectively.


4. Which of following is not a phase of project management?


5. The symbols A and B represent _____ and ____ respectively.


6. The full form of PERT is _______


7. The symbol given below represents ____


8. In a network, a critical path is time-wise shortest path.


9. A PERT network is activity-oriented while a CPM network is event-oriented.


10. A foundation plan depicts details of different types of foundations provided for building.


All Chapters

View all Chapter and number of question available From each chapter from construction-building-materials

Functional Planning of Buildings

Functional Planning of Buildings

Important Building Components

Important Building Components

Site Investigation and Ground Techniques

Site Investigation and Ground Techniques

Foundations

Foundations

Deep Excavations, Pile Foundations and Caisson

Deep Excavations, Pile Foundations and Caisson

Stone and Brick Masonry

Stone and Brick Masonry

Composite Masonry

Composite Masonry

Load Bearing Walls

Load Bearing Walls

Cavity Walls & Partition Walls

Cavity Walls & Partition Walls

Scaffolding, Shoring and Underpinning

Scaffolding, Shoring and Underpinning

Damp Proofing, Water Proofing and Termite Proofing

Damp Proofing, Water Proofing and Termite Proofing

Cement Concrete Construction

Cement Concrete Construction

Arches, Lintels, Stairs and Formwork

Arches, Lintels, Stairs and Formwork

Doors, Windows and Ventilators

Doors, Windows and Ventilators

Fire Protection in Building, Carpentry and Joinery

Fire Protection in Building, Carpentry and Joinery

Floors and Flooring

Floors and Flooring

Roofing Materials

Roofing Materials

Pointing and Plastering

Pointing and Plastering

Painting, Varnishing, Distempering, etc

Painting, Varnishing, Distempering, etc

Acoustics and Ventilation

Acoustics and Ventilation

Air Conditioning, Thermal Insulation, Stones & Ferrous Metals

Air Conditioning, Thermal Insulation, Stones & Ferrous Metals

Steel, Timber, Mortar, Plastics, Non-Ferrous Metals and Alloys

Steel, Timber, Mortar, Plastics, Non-Ferrous Metals and Alloys

Glass, Lime, Clay Products & Bricks

Glass, Lime, Clay Products & Bricks

Miscellaneous Materials, Plain and Reinforced Cement Concrete

Miscellaneous Materials, Plain and Reinforced Cement Concrete

Construction Equipments

Construction Equipments

Plumbing for Building

Plumbing for Building

Earthquake Resistant Buildings

Earthquake Resistant Buildings

Building Plans, PERT and CPM

Building Plans, PERT and CPM

Rate Analysis, Estimation and Costing

Rate Analysis, Estimation and Costing