1. In _________ floors, brick arches or cement concrete arches are constructed and se arches rest on lower flanges of mild steel joists.


2. The or floors of each storey about ground level are known as _______


3. The flooring of _________ material consists of square or rectangular slab of stones.


4. The bearing of joists on wall should not be less than half of width of wall.


5. In ribbed flooring, depth of rib is at least _____ with free support.


6. Which of following reasons is not responsible for preference of non-monolithical construction over monolithical construction in cement concrete flooring?


7. In simple reinforced cement concrete slab flooring, it is important to provide reinforcement in both directions when length of room is _____ times its width.


8. The thickness of mortar bed on which brick flooring is laid is ____


9. In mosaic flooring, surface is rubbed with ______ to make it smooth and polished.


10. Which of following types of flooring is spread directly on concrete?


All Chapters

View all Chapter and number of question available From each chapter from construction-building-materials

Functional Planning of Buildings

Functional Planning of Buildings

Important Building Components

Important Building Components

Site Investigation and Ground Techniques

Site Investigation and Ground Techniques

Foundations

Foundations

Deep Excavations, Pile Foundations and Caisson

Deep Excavations, Pile Foundations and Caisson

Stone and Brick Masonry

Stone and Brick Masonry

Composite Masonry

Composite Masonry

Load Bearing Walls

Load Bearing Walls

Cavity Walls & Partition Walls

Cavity Walls & Partition Walls

Scaffolding, Shoring and Underpinning

Scaffolding, Shoring and Underpinning

Damp Proofing, Water Proofing and Termite Proofing

Damp Proofing, Water Proofing and Termite Proofing

Cement Concrete Construction

Cement Concrete Construction

Arches, Lintels, Stairs and Formwork

Arches, Lintels, Stairs and Formwork

Doors, Windows and Ventilators

Doors, Windows and Ventilators

Fire Protection in Building, Carpentry and Joinery

Fire Protection in Building, Carpentry and Joinery

Floors and Flooring

Floors and Flooring

Roofing Materials

Roofing Materials

Pointing and Plastering

Pointing and Plastering

Painting, Varnishing, Distempering, etc

Painting, Varnishing, Distempering, etc

Acoustics and Ventilation

Acoustics and Ventilation

Air Conditioning, Thermal Insulation, Stones & Ferrous Metals

Air Conditioning, Thermal Insulation, Stones & Ferrous Metals

Steel, Timber, Mortar, Plastics, Non-Ferrous Metals and Alloys

Steel, Timber, Mortar, Plastics, Non-Ferrous Metals and Alloys

Glass, Lime, Clay Products & Bricks

Glass, Lime, Clay Products & Bricks

Miscellaneous Materials, Plain and Reinforced Cement Concrete

Miscellaneous Materials, Plain and Reinforced Cement Concrete

Construction Equipments

Construction Equipments

Plumbing for Building

Plumbing for Building

Earthquake Resistant Buildings

Earthquake Resistant Buildings

Building Plans, PERT and CPM

Building Plans, PERT and CPM

Rate Analysis, Estimation and Costing

Rate Analysis, Estimation and Costing
WhatsApp