Rate Analysis, Estimation and Costing

Course: Construction & Building Materials — Practice MCQs, solutions, formulas & past entrance questions.

Chapter:

rate-analysis-estimation-and-costing (Click to view content)

1. In case of works which require some special types of equipment, an amount of __ percent of estimated cost is given.


2. The unit of payment of cement concrete in lintels is _____


3. In long wall-short wall method, length of long wall is calculated after addition of _____ to its centre line length at each end.


4. For preparation of approximate estimates, cubical contents method is more accurate than unit base method and plinth area method.


5. Single units work such as doors and windows are expressed in ____


6. Calculate number of cement bags required for 2500 kg of cement.


7. In long wall-short wall method, length of short wall generally increases from earthwork to brickwork in superstructure.


8. Unit of measurement of rainwater pipe is ____


9. The concrete used for cement concrete roads is of grade _______


10. While fixing rate per unit of an item, quantity of materials and labour needed for one unit of an item are strictly per ______


All Chapters

View all Chapter and number of question available From each chapter from construction-building-materials

Functional Planning of Buildings

Functional Planning of Buildings

Important Building Components

Important Building Components

Site Investigation and Ground Techniques

Site Investigation and Ground Techniques

Foundations

Foundations

Deep Excavations, Pile Foundations and Caisson

Deep Excavations, Pile Foundations and Caisson

Stone and Brick Masonry

Stone and Brick Masonry

Composite Masonry

Composite Masonry

Load Bearing Walls

Load Bearing Walls

Cavity Walls & Partition Walls

Cavity Walls & Partition Walls

Scaffolding, Shoring and Underpinning

Scaffolding, Shoring and Underpinning

Damp Proofing, Water Proofing and Termite Proofing

Damp Proofing, Water Proofing and Termite Proofing

Cement Concrete Construction

Cement Concrete Construction

Arches, Lintels, Stairs and Formwork

Arches, Lintels, Stairs and Formwork

Doors, Windows and Ventilators

Doors, Windows and Ventilators

Fire Protection in Building, Carpentry and Joinery

Fire Protection in Building, Carpentry and Joinery

Floors and Flooring

Floors and Flooring

Roofing Materials

Roofing Materials

Pointing and Plastering

Pointing and Plastering

Painting, Varnishing, Distempering, etc

Painting, Varnishing, Distempering, etc

Acoustics and Ventilation

Acoustics and Ventilation

Air Conditioning, Thermal Insulation, Stones & Ferrous Metals

Air Conditioning, Thermal Insulation, Stones & Ferrous Metals

Steel, Timber, Mortar, Plastics, Non-Ferrous Metals and Alloys

Steel, Timber, Mortar, Plastics, Non-Ferrous Metals and Alloys

Glass, Lime, Clay Products & Bricks

Glass, Lime, Clay Products & Bricks

Miscellaneous Materials, Plain and Reinforced Cement Concrete

Miscellaneous Materials, Plain and Reinforced Cement Concrete

Construction Equipments

Construction Equipments

Plumbing for Building

Plumbing for Building

Earthquake Resistant Buildings

Earthquake Resistant Buildings

Building Plans, PERT and CPM

Building Plans, PERT and CPM

Rate Analysis, Estimation and Costing

Rate Analysis, Estimation and Costing
WhatsApp