Scaffolding, Shoring and Underpinning

Course: Construction & Building Materials — Practice MCQs, solutions, formulas & past entrance questions.

Chapter:

scaffolding-shoring-and-underpinning (Click to view content)

1. In _____ method, piles are driven along both sides of existing wall and needle in form of pile caps are provided through existing one.


2. ___________ type of Shoring is suitable for a maximum distance of about 9 m between adjacent parallel walls.


3. In ________ shore arrangement, inclined supports are given to external walls from ground.


4. _________ method is useful when soil consists of sand or granular material.


5. In _______ shores, needles are placed at a distance of about 1.5 m to 2 m and y are suitably braced.


6. __________ is a very light type of scaffolding and can be used only for maintenance work such as painting, pointing, whitewashing, etc.


7. __________ type of scaffolding is used when proper hard ground is not available for standards to rest.


8. The placing of new Foundation below and existing foundation of process of strengning existing Foundation is known as _______ of foundation.


9. _________ is a Board placed parallel to Ledgers and supported between Putlogs.


10. In _______ method, underpinning is carried out by vibrating sand.


All Chapters

View all Chapter and number of question available From each chapter from construction-building-materials

Functional Planning of Buildings

Functional Planning of Buildings

Important Building Components

Important Building Components

Site Investigation and Ground Techniques

Site Investigation and Ground Techniques

Foundations

Foundations

Deep Excavations, Pile Foundations and Caisson

Deep Excavations, Pile Foundations and Caisson

Stone and Brick Masonry

Stone and Brick Masonry

Composite Masonry

Composite Masonry

Load Bearing Walls

Load Bearing Walls

Cavity Walls & Partition Walls

Cavity Walls & Partition Walls

Scaffolding, Shoring and Underpinning

Scaffolding, Shoring and Underpinning

Damp Proofing, Water Proofing and Termite Proofing

Damp Proofing, Water Proofing and Termite Proofing

Cement Concrete Construction

Cement Concrete Construction

Arches, Lintels, Stairs and Formwork

Arches, Lintels, Stairs and Formwork

Doors, Windows and Ventilators

Doors, Windows and Ventilators

Fire Protection in Building, Carpentry and Joinery

Fire Protection in Building, Carpentry and Joinery

Floors and Flooring

Floors and Flooring

Roofing Materials

Roofing Materials

Pointing and Plastering

Pointing and Plastering

Painting, Varnishing, Distempering, etc

Painting, Varnishing, Distempering, etc

Acoustics and Ventilation

Acoustics and Ventilation

Air Conditioning, Thermal Insulation, Stones & Ferrous Metals

Air Conditioning, Thermal Insulation, Stones & Ferrous Metals

Steel, Timber, Mortar, Plastics, Non-Ferrous Metals and Alloys

Steel, Timber, Mortar, Plastics, Non-Ferrous Metals and Alloys

Glass, Lime, Clay Products & Bricks

Glass, Lime, Clay Products & Bricks

Miscellaneous Materials, Plain and Reinforced Cement Concrete

Miscellaneous Materials, Plain and Reinforced Cement Concrete

Construction Equipments

Construction Equipments

Plumbing for Building

Plumbing for Building

Earthquake Resistant Buildings

Earthquake Resistant Buildings

Building Plans, PERT and CPM

Building Plans, PERT and CPM

Rate Analysis, Estimation and Costing

Rate Analysis, Estimation and Costing
WhatsApp