Chapter:

analysis-of-rates

1. A bullock cart can carry about _____ load.


2. Laying of pipes shall proceed up grade of slopes. The error of grade shall not be rectified by packing up earth underneath pipes.


3. Instead of plastering entire surface of masonry, special mortar finishing work is done to exposed joints. This is called pointing.


4. The approximate cost of a building of cubic content of 400 cu m@ Rs.180/- per cu m is ______


5. This shall be of Chromium plated brass and approximately 25mm in diameter.


6. The __________ is region of pavement section that is located directly under surface course.


7. The quantity of cement concrete may be calculated by multiplying area of floor by thickness.


8. __________ include general office expenses, rents, taxes, supervision and or costs which are indirect expenses and not productive expenses on job.


9. Anti-siphonage pipe is connected to ______


10. One differentiates between interior and exterior fireproofing. Exterior products are typically less substantial, with lower densities and lower cost. Interior products have to withstand more extreme fire and or environmental conditions.


All Chapters

View all Chapter and number of question available From each chapter from civil-engineering-drawing-estimates

Lettering Practice, Scales & Curves

Lettering Practice, Scales & Curves

Orthographic Projection, Projections of Lines, Planes and Solids

Orthographic Projection, Projections of Lines, Planes and Solids

Development of Surfaces, Isometric Projections, Perspective Projections & Transformation of Projections

Development of Surfaces, Isometric Projections, Perspective Projections & Transformation of Projections

Nomography, Computer Aided Drafting & Procedure of Estimating

Nomography, Computer Aided Drafting & Procedure of Estimating

Methods of Building Estimate & Estimate of Building

Methods of Building Estimate & Estimate of Building

Different Type Roofs, R.C.C. Work and Structure

Different Type Roofs, R.C.C. Work and Structure

Road Estimating, Sanitary and Water Supply Work

Road Estimating, Sanitary and Water Supply Work

Irrigation Works, Culverts, Bridges and Wells

Irrigation Works, Culverts, Bridges and Wells

Analysis of Rates

Analysis of Rates

Specifications, Estimation of Quantities of Materials and Transport

Specifications, Estimation of Quantities of Materials and Transport

Rules and Methods of Measurement

Rules and Methods of Measurement

Valuation, Reports Technical and Design Data

Valuation, Reports Technical and Design Data

P.W.D. Accounts and Procedure for Works

P.W.D. Accounts and Procedure for Works

Planning of Building and Colony

Planning of Building and Colony

Village Housing

Village Housing

Schedule of Rates Metric and F.B. System

Schedule of Rates Metric and F.B. System