Chapter:
village-housing
1. The brick work is not measured in cu m in case of ______
2. For village housing which cannot be used as a superstructure?
3. The minimum head room over a stair must be?
4. Before applying water proof mud plaster, joints should not be scrapped.
5. As per I.S. 456 – 1978, pH value of water shall be?
6. 70% of rural households have access to electricity.
7. Stabilized soil wall is cued for __ to __ days by sprinkling water.
8. The Low income housing construction funding is provided by ______
9. A real estate bubble is a type of economic bubble that occurs periodically in local or global real estate markets, typically following a land boom.
10. For village road planning ‘rectangular’ pattern layout is suitable.
All Chapters
View all Chapter and number of question available From each chapter from civil-engineering-drawing-estimates
Lettering Practice, Scales & Curves
Lettering Practice, Scales & Curves
Orthographic Projection, Projections of Lines, Planes and Solids
Orthographic Projection, Projections of Lines, Planes and Solids
Development of Surfaces, Isometric Projections, Perspective Projections & Transformation of Projections
Development of Surfaces, Isometric Projections, Perspective Projections & Transformation of Projections
Nomography, Computer Aided Drafting & Procedure of Estimating
Nomography, Computer Aided Drafting & Procedure of Estimating
Methods of Building Estimate & Estimate of Building
Methods of Building Estimate & Estimate of Building
Different Type Roofs, R.C.C. Work and Structure
Different Type Roofs, R.C.C. Work and Structure
Road Estimating, Sanitary and Water Supply Work
Road Estimating, Sanitary and Water Supply Work
Irrigation Works, Culverts, Bridges and Wells
Irrigation Works, Culverts, Bridges and Wells
Analysis of Rates
Analysis of Rates
Specifications, Estimation of Quantities of Materials and Transport
Specifications, Estimation of Quantities of Materials and Transport
Rules and Methods of Measurement
Rules and Methods of Measurement
Valuation, Reports Technical and Design Data
Valuation, Reports Technical and Design Data
P.W.D. Accounts and Procedure for Works
P.W.D. Accounts and Procedure for Works
Planning of Building and Colony
Planning of Building and Colony
Village Housing
Village Housing
Schedule of Rates Metric and F.B. System
Schedule of Rates Metric and F.B. System
Topics
This Chapter village-housing consists of the following topics
Guest