Chapter:
rules-and-methods-of-measurement
1. Dimensional lumber is lumber that is cut to standardized width and depth, specified in inches.
2. ___________ is very hard wood and has a dark reddish brown color. It is fragrant and close grained. It is hard to work and takes high polish. Used in musical instruments, piano cases, tool handles, art projects, veneers and furniture.
3. A ___________ is a carpenter who does fine and detailed work specializing in making of cabinets made from wood, wardrobes, dressers, storage chest, and or furniture designed for storage.
4. Reinforced concrete (RC) is a composite material in which concrete’s relatively low tensile strength and ductility are counteracted by inclusion of reinforcement having higher tensile strength or ductility.
5. The major type of reinforcements used in prestressing is ____
6. Mild iron deficiency can be prevented or corrected by eating iron-rich foods and by cooking in an iron skillet.
7. Which is not a type of steel?
8. Disinfection of drinking water, is done to remove _______
9. Wrought ironwork is forged by a blacksmith using an ______
10. PCI stands for – Pulverized Coal Injection Method.
All Chapters
View all Chapter and number of question available From each chapter from civil-engineering-drawing-estimates
Lettering Practice, Scales & Curves
Lettering Practice, Scales & Curves
Orthographic Projection, Projections of Lines, Planes and Solids
Orthographic Projection, Projections of Lines, Planes and Solids
Development of Surfaces, Isometric Projections, Perspective Projections & Transformation of Projections
Development of Surfaces, Isometric Projections, Perspective Projections & Transformation of Projections
Nomography, Computer Aided Drafting & Procedure of Estimating
Nomography, Computer Aided Drafting & Procedure of Estimating
Methods of Building Estimate & Estimate of Building
Methods of Building Estimate & Estimate of Building
Different Type Roofs, R.C.C. Work and Structure
Different Type Roofs, R.C.C. Work and Structure
Road Estimating, Sanitary and Water Supply Work
Road Estimating, Sanitary and Water Supply Work
Irrigation Works, Culverts, Bridges and Wells
Irrigation Works, Culverts, Bridges and Wells
Analysis of Rates
Analysis of Rates
Specifications, Estimation of Quantities of Materials and Transport
Specifications, Estimation of Quantities of Materials and Transport
Rules and Methods of Measurement
Rules and Methods of Measurement
Valuation, Reports Technical and Design Data
Valuation, Reports Technical and Design Data
P.W.D. Accounts and Procedure for Works
P.W.D. Accounts and Procedure for Works
Planning of Building and Colony
Planning of Building and Colony
Village Housing
Village Housing
Schedule of Rates Metric and F.B. System
Schedule of Rates Metric and F.B. System
Topics
This Chapter rules-and-methods-of-measurement consists of the following topics
Guest