1. In India rails are manufactured bywhom?


2. These are less urgent repair work that can wait a short time up to 28 days are ________


3. How are final contracts signed in modern business?


4. In P.W.D, name person who submits budget.


5. At a rail joint, ends of adjoining rails, are connected with a pair of fish plates and ___


6. Minimum depth of ballast prescribed of B.G. trunk lines of Indian Railways is?


7. In Schedule contract contractor undertakes execution or construction of specific work with all its contingencies, to complete it in all respect within a specified time for a fixed amount.


8. Which department deals with water supply, sanitary work?


9. Dimensions of a plate girder are _____


10. For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, quantity of cement required, is ____


All Chapters

View all Chapter and number of question available From each chapter from civil-engineering-drawing-estimates

Lettering Practice, Scales & Curves

Lettering Practice, Scales & Curves

Orthographic Projection, Projections of Lines, Planes and Solids

Orthographic Projection, Projections of Lines, Planes and Solids

Development of Surfaces, Isometric Projections, Perspective Projections & Transformation of Projections

Development of Surfaces, Isometric Projections, Perspective Projections & Transformation of Projections

Nomography, Computer Aided Drafting & Procedure of Estimating

Nomography, Computer Aided Drafting & Procedure of Estimating

Methods of Building Estimate & Estimate of Building

Methods of Building Estimate & Estimate of Building

Different Type Roofs, R.C.C. Work and Structure

Different Type Roofs, R.C.C. Work and Structure

Road Estimating, Sanitary and Water Supply Work

Road Estimating, Sanitary and Water Supply Work

Irrigation Works, Culverts, Bridges and Wells

Irrigation Works, Culverts, Bridges and Wells

Analysis of Rates

Analysis of Rates

Specifications, Estimation of Quantities of Materials and Transport

Specifications, Estimation of Quantities of Materials and Transport

Rules and Methods of Measurement

Rules and Methods of Measurement

Valuation, Reports Technical and Design Data

Valuation, Reports Technical and Design Data

P.W.D. Accounts and Procedure for Works

P.W.D. Accounts and Procedure for Works

Planning of Building and Colony

Planning of Building and Colony

Village Housing

Village Housing

Schedule of Rates Metric and F.B. System

Schedule of Rates Metric and F.B. System