Chapter:
road-estimating-sanitary-and-water-supply-work
1. Symbol shown below represents __________ type of road signal.
2. The value of ‘B’ of Indian type W.C. shown in given figure is?
3. Find area of permanent land required for a State Highway for one kilometre length, width of permanent land being 30 m.
4. Connecting pipe should be ___ mm minimum diameter.
5. The surface of head of each of two rails can be maintained by using a _______
6. ____ traps are used for receiving waste water from kitchen sinks, baths and rain and surface water from house.
7. Which type of trap is shown by figure below?
8. The size of faeces drop hole in floor or slab should not be larger than ________
9. The shape of ballast should be _________
10. What is longitudinal slope called?
All Chapters
View all Chapter and number of question available From each chapter from civil-engineering-drawing-estimates
Lettering Practice, Scales & Curves
Lettering Practice, Scales & Curves
Orthographic Projection, Projections of Lines, Planes and Solids
Orthographic Projection, Projections of Lines, Planes and Solids
Development of Surfaces, Isometric Projections, Perspective Projections & Transformation of Projections
Development of Surfaces, Isometric Projections, Perspective Projections & Transformation of Projections
Nomography, Computer Aided Drafting & Procedure of Estimating
Nomography, Computer Aided Drafting & Procedure of Estimating
Methods of Building Estimate & Estimate of Building
Methods of Building Estimate & Estimate of Building
Different Type Roofs, R.C.C. Work and Structure
Different Type Roofs, R.C.C. Work and Structure
Road Estimating, Sanitary and Water Supply Work
Road Estimating, Sanitary and Water Supply Work
Irrigation Works, Culverts, Bridges and Wells
Irrigation Works, Culverts, Bridges and Wells
Analysis of Rates
Analysis of Rates
Specifications, Estimation of Quantities of Materials and Transport
Specifications, Estimation of Quantities of Materials and Transport
Rules and Methods of Measurement
Rules and Methods of Measurement
Valuation, Reports Technical and Design Data
Valuation, Reports Technical and Design Data
P.W.D. Accounts and Procedure for Works
P.W.D. Accounts and Procedure for Works
Planning of Building and Colony
Planning of Building and Colony
Village Housing
Village Housing
Schedule of Rates Metric and F.B. System
Schedule of Rates Metric and F.B. System
Topics
This Chapter road-estimating-sanitary-and-water-supply-work consists of the following topics
Guest